Aldermen Herbert Raat (Sports) and Frank Berkhout (Real Estate) together with Heleen van Ketwich Verschuur, director of AmstelveenSport, symbolically drove the first pile for the expansion of swimming pool De Meerkamp into the ground on Thursday 1 February. With this festive moment, the construction of the new pool has officially started.
“The swimming safety of Amstelveen children is one of our priorities,” says alderman Herbert Raat (Sport). “A swimming pool is therefore one of the most important facilities in a municipality. With the support of the municipal council, De Meerkamp is being expanded with extra swimming water to ensure that children can take swimming lessons as soon as possible. Until then, De Meerkamp is already taking various measures to shorten these waiting lists.”
“We are building a sustainable, contemporary and widely applicable indoor pool for all Amstelveners,” says alderman Frank Berkhout (Real Estate). “For example, there will be a movable floor and a partition wall, making the pool suitable for competitive swimming and other water sports in addition to swimming lessons. In addition, there will be new offices for the AmstelveenSport organization. Their current accommodation, in a small building behind De Meerkamp, is outdated and too small for this growing organization.”
Two years ago, plans were made to create more swimming water in Amstelveen. The first phase of this is to expand the existing swimming pool De Meerkamp with an indoor competition pool of 25x21 meters. With this extra swimming water, the waiting lists for swimming lessons can be reduced. “I think it is fantastic that this pool is coming, we are responding to the growth of the Amstelveen population and thanks to the extra instruction water we can ensure that children receive swimming lessons on time,” says Heleen van Ketwich Verschuur.
The new building is energy-efficient and sustainable and complies with the municipal sustainability policy. The design takes climate adaptation into account, which means that it is resistant to current and still changing climatic conditions. In addition, it is nature-inclusive, which means that space for biodiversity is deliberately created on, at or in the building or the (public) environment, so that more diverse plant and animal species can live there. The new indoor pool will be built next to the current swimming pool and will be an extension of the Meerkamp sports hall. This will eliminate part of the lawn around the outdoor pool. The construction work will last the whole of 2024, but will not disrupt the outdoor swimming season; the outdoor pool will traditionally open on 28 April. The new indoor pool will be put into use with the start of the new swimming lesson season after the summer holidays in September 2025.
The progress of the construction of the extension of the De Meerkamp swimming pool can be followed via: amstelveensport.nl/voortgang-groei-zwembad


